<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0"><channel><title><![CDATA[CC Underground]]></title><description><![CDATA[ccunderground]]></description><link>https://www.ccunderground.ca/blog</link><generator>RSS for Node</generator><lastBuildDate>Sun, 05 Jul 2026 19:04:24 GMT</lastBuildDate><atom:link href="https://www.ccunderground.ca/blog-feed.xml" rel="self" type="application/rss+xml"/><item><title><![CDATA[How Horizontal Directional Drilling Works: The 3-Stage HDD Process ]]></title><description><![CDATA[Key Takeaways  • Horizontal directional drilling (HDD) installs underground utilities in three stages: pilot bore, reaming, and pullback. Each stage serves a distinct function and requires different equipment configurations.  • The pilot bore is steered using a sonde transmitter tracked by a walkover locating system, allowing the operator to navigate around existing utilities and maintain the designed bore path.  • HDD installs water, sewer, gas, electrical conduit, and fibre/telecom conduit...]]></description><link>https://www.ccunderground.ca/post/how-horizontal-directional-drilling-works</link><guid isPermaLink="false">6a493467f7b480551f0fd379</guid><pubDate>Sat, 04 Jul 2026 16:34:54 GMT</pubDate><dc:creator>Nitika Sharma</dc:creator></item></channel></rss>